what is the procedure to make compressive strength test for
concrete cube in lab
Answers were Sorted based on User's Feedback
Answer / joel soans
The procedure is to test it in compression testing machine or UTM, for 7 days ,14 days and 28days and if required for 45 days, when the previous results are not satisfactory.
Compression testing measures the amount of compression which can be resisted by the cube and can be read in dial gauge or digital meter of the machine...The crushing of concrete cube at the certain pressure or compression resembles its crushing strength or compressive strength in N/mmsq
Is This Answer Correct ? | 10 Yes | 1 No |
To prepare the concrete mix for example M20 grade concrete,
to attained the strength in 28 days curing period, after to
check the compressive strength of concrete.
Is This Answer Correct ? | 4 Yes | 0 No |
Answer / sjtbehera
to test the compresive strength of concrete, a copmreesive
test machines avaliable in the market. generally pressure
are devlop by hydraulic jack. A cube 22.5 x22.5 square cube
mould ara availabe. this mould will fille up by concrete
and immersed in water 24hrs.. after this cube are test at 7
days and 24 days mould. A pressure gauge is on testing
machines. the mould are keep under pressure and give
pressure when moulds are break. The moment of breaking
mould see the pressure delvop by machines. it is usally
expresse in kg.cmsq. you can convert it N/mmsq.
this is the funda if compressive strength testing machines.
Is This Answer Correct ? | 2 Yes | 1 No |
whta are the types of columns
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
What is the capacity of Maharashtra in power generation by winds?
5 Answers MPSC, State Bank Of India SBI,
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
what would be compressive strength of cube for 7 days if design mix of M15
how to calculate triangular ring cutting length
Cube tests of concrete are failed at 7 days and 28 days.What is your next action?
how we can calculate a bentup hook in difreeent angles.for exp.at 90 degree,45degree,60 degree..
why shear reinforcement is not provided in the design of footing?
how to calculate concrete pouring of foundation
Which word is coolest among the 26 alphabets?
what is the pile
1 Answers Chandra Group, GVR Constructions, Simplex,