A floor has to be removed partially with block work tying
floors together, can block work continue on floor that has
to removed excluding demolishing works tying floor from
underside of slab and top of slab demolishing floor upon
completion?
Why alternate bars are given bent-up in slab and how to decide the length of bent up?
If we use oil,inner on the column box, it'll make rust on the column steel?
tell me how to calculate by weight and by volume the quantity of cement sand mortar of 1:2
How to calculate Volume of Wet cement concrete for a specific grade?
Types os Water proofing?
undisturb samples are obtained by direct excavation thin walled sampler thick walled sampler none of this
what is the difference between linear and curved elements?
What are the applications of modulus of elasticity?
What is meant by scaffolding coefficient?
how to estimate shuttering form work or how to take off material quantity???
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
how to clculate the %of concrete strenght achive after curing?load
0 Answers L&T, RJ Construction,