I have a 1000 kVA Transformer(11kV/0.415kV) and a APFC panel
of 400 kVAR(LT).Now if i want to remove the LT APFC panel
and install a HT(11kV) APFC panel on the HT side is the HT
APFC panel will work same as the LT APFC panel(improve the
power factor),if yes what will be rating of the HT APFC
panel?what is the formula to calculate HT APFC panel rating???
Answers were Sorted based on User's Feedback
Answer / k.prakashchandra
The power on HT side is equal to power on LT side +
3%(1.6%). The power rating of APFC remains the same.
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / kathiravan
Since the PF is corrected "before" the bank is connected
(EX:A--------B---------------C----------------D-----------E.
Suppose If the bank is connected the location @"C",the PF will be corrected from location A to C only,where as location C to E will not be effected by the installation of location C)there wont be much effected weather to locate capacitor either primary or secondary of the transformer.Rating of the capacitor must be the respect of HV/LV supply voltage.
| Is This Answer Correct ? | 1 Yes | 1 No |
What will hapen if we connect more capacitors than required for powerfactor control? Exactly what will be the effect on power system?
what is phase and neutral.
Wht ar the reason for low voltage on consumer side?
where does core based current transformer is used? and what is the value of lux in a work station?
What Should I Know about Metering, Switchgear and Panels?
where AVR is connected in power plant.
7 Answers ABB, Saudi Red Bricks,
What kind of maintenance is conducted for Transformer
0 Answers Gulf, UB Engineering,
What is corona? and what is the purpose of corona belt in substation ? why they connect these end of the buses ?
What will Happened if the polarity of CT is changed?
directional relay is typically used to respond in fault condition who it can be used just as reverse power protection which purely senes direction reversal to operate a circuit breaker?
Explain and give me an example of a time when you had to explain some new procedures to your co-workers for quality service delivery, how did you go about it?
What is the previous name of Cox's Bazar
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)