what is the minium content of cementous material per cu
meter
Answers were Sorted based on User's Feedback
Answer / shridhar
The amount of cementitious mateiral is determined by amount
of portland cement plus amount of fly ash.The minimum
portland cement content should be 350 kg/m3 of concrete
Is This Answer Correct ? | 1 Yes | 1 No |
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
draw the sfd and bmd of catilever beam subjected to point load and udl. plot graphically the difference in deflection pattern of simply supported and cantilever beam subjected to point load.
How to calculate steel for beam slab and column
Does brick grows bigger every year?
difference between high rise & multistoried building?
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
What is the significance of Hook's in stirrups.
what is the significance of bending moment in a structure?
what is the difference between replacement of cement by groundnut shell ash
How to calculate the wall thickness of building?
How much steel required in 1 square feet slab?
Dear Sir I Mahesh C. Bhamre have already given a Exam for Superintendent Officer / Public relation Officer Exam Dharmday Aaukta held at Nashik on Date 29/08/2010. My seat no was 5040247. and my cell no is 9822677994. and my mail Id is - mahesh.bhamre@rediffmail.com So can you pl send me details of result of respective exams. Thanking you in Anticipation.