while doing floring in a room,from where one can start
laying tiles.
Answers were Sorted based on User's Feedback
Answer / aamir azmi
Flooring start at that corner where the cut piece of tiles not comes infront of main doors.
| Is This Answer Correct ? | 9 Yes | 1 No |
Answer / ajay rai
Normally, flooring do start from one line of room where we
ignore the cut piece, But it can be start form the centre
of the room in case of diamond pattren.
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / riddhi rawal
It should start according to the slope to be given.
Starting from higher side to lower side.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / swati chandra
always start from the middle of the room or the land area.
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / sobhanbabu
tiles always start from main entrance only.becoz pieces wont come near the entrance and pieces comes at corners.
if any threshold comes near the door frame we can start from any corner.
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / ashish singh
its a room
wherever u start u hav to end somewhere
so it should not depend on the position
it only depends on perfection...
| Is This Answer Correct ? | 0 Yes | 0 No |
which tie is used in binding of steel double tie or single ti?
How did the romans get water up hills using aqua ducts?
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
what is the material consumption of 1:2:4 by kilogram?
why the horizontal crack occoured in the joint between brick work and lintel?pls. give clarification???
What is the graphical relationship between N - Value of soil and Dia. of pile when pile length is fixed, and n - Value and length of pile when its dia. is fixed.
what is the difference between site engineer & site incharge
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
acceptance criteria for concrete works
how to calculate rate analysis for shuttering of waffle slab
How to calculate the individuals quantities of cement,sand,and aggregate having 1:2:4 ratio for 50 cubic meter area.
1 Answers Aparna Constructions,
11. What was the reason for you to quit your previous job?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)