while doing floring in a room,from where one can start
laying tiles.
Answer Posted / riddhi rawal
It should start according to the slope to be given.
Starting from higher side to lower side.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
Why is concrete cube test carried out?
Explain the mechanism of cavitations in pipes and drains?
Explain moment of inertia?
What is the difference between Grade I, II and III of GSB?
how many time use of plywood shuttering and IS code
What is progress payment?
Explain what is Critical Path Method (C.P.M)?
what is that one cub metre plaster in cemant and fine sand
what is concrete canvas?
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
How can you achieve soil enforcement?
what is idealized curve for concrere and steel
How to take labor charges for construction of 1cum of concrete?