while doing floring in a room,from where one can start
laying tiles.

Answer Posted / sobhanbabu

tiles always start from main entrance only.becoz pieces wont come near the entrance and pieces comes at corners.
if any threshold comes near the door frame we can start from any corner.

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?

4648


What is the best type of wood glue?

696


the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C

1575


How to calculate brick work quantity?? Block work quantity??

2112


how much tempareture are required to make liquid state of pid leed

1710






Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem

2319


Formula of mid span bar

1463


20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks

2226


Why is the use of granular sub-base in concrete carriageways not preferred, explain?

766


Minimum concrete cover in slabs, columns, beams, foundation and other st?

670


What is horizon or horizontal mining?

639


How can we make a hole in a solid rectangle using solidsworks?

760


how we check the thickness and line of ceiling plaster.

2223


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1675


What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.

1554