Based on what the rating of machines are provided??(ANswer should in single word)

Answers were Sorted based on User's Feedback



Based on what the rating of machines are provided??(ANswer should in single word)..

Answer / vicky

INSULATION OF THE MACHINES

Is This Answer Correct ?    21 Yes 12 No

Based on what the rating of machines are provided??(ANswer should in single word)..

Answer / ifthekar ahamed

Load on the machine

Is This Answer Correct ?    7 Yes 4 No

Based on what the rating of machines are provided??(ANswer should in single word)..

Answer / abhishek

it is based on thermal model of machine

Is This Answer Correct ?    3 Yes 3 No

Based on what the rating of machines are provided??(ANswer should in single word)..

Answer / vivek

work done/energy input

Is This Answer Correct ?    0 Yes 0 No

Based on what the rating of machines are provided??(ANswer should in single word)..

Answer / f0rest

the winding temperature.

Is This Answer Correct ?    0 Yes 0 No

Based on what the rating of machines are provided??(ANswer should in single word)..

Answer / vijay kumar sirangi

it depends on maximum load dit can with stand ,

Is This Answer Correct ?    0 Yes 0 No

Based on what the rating of machines are provided??(ANswer should in single word)..

Answer / amlan

Based on Insulation and Current carrying capacity.

Is This Answer Correct ?    0 Yes 0 No

Based on what the rating of machines are provided??(ANswer should in single word)..

Answer / subbarao

based on the driven equipment BHP and application of mechine

Is This Answer Correct ?    0 Yes 0 No

Based on what the rating of machines are provided??(ANswer should in single word)..

Answer / srikant

losses....eg transformer rated in KVA because its iron
&copper losses depend upon voltage and current.losses lead
to heating which limits applied current and voltage.

Is This Answer Correct ?    0 Yes 0 No

Based on what the rating of machines are provided??(ANswer should in single word)..

Answer / abhi

construction

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

Is it alright to connect more than one RCCB of same rating in series for a three phase equipment?

3 Answers  


How will you Protect aeroplanes and Ships from Lightining?

3 Answers   Parco,


what is the use of power transformer in GSS.

0 Answers   College School Exams Tests, DLF, TCS,


Buchholz relay is used ………. a) protection T/F b) oil T/F c) Air core T/F

8 Answers   Engineers India Limited,


what is stacking factor?

1 Answers  






A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

0 Answers  


a 120 60 watt incandescent lamp has to be operated from 50 c/sec 1 phase ac supply. in order to do this a circuit element has to be connect in series with the lamp. which one of the following sries element is preferable.

1 Answers   SSC,


how many single tension hardware are required on a double circuit transmission tower?

0 Answers  


want to know about DMRC

4 Answers  


What is the purpose of Vector Group in transformer?

1 Answers   Andritz, ThyssenKrupp,


presently I am working in private sector.In powergrid interview recruiter asked me why you join this organization.

0 Answers   Power Grid,


We use ungrounded DC system (220V/110V) for control and protection system in substations etc. Suppose we have long 2 core DC cables running from our DCDB in control room to the load (length of around 2 to 3 km). Do we need to protect these long DC cables from earth leakages or not? If yes how?

5 Answers   Siemens,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)