i'm a chemical engineer with an aggregate of 80% and i'm going to attend for TCS next week...if i encounter a question like this how i have to answer...
WHY YOU CHOOSE SOFTWARE RATHER THAN YOUR CORE COMPANIES?
No Answer is Posted For this Question
Be the First to Post Answer
QUANTUM BIOLOGY - EXAMPLE 33.2 : (a) In a biomolecule, ATP hydrolysis will produce 3 kcal / mol to 60 kcal / mol of energy, according to energy scale. Find the range of such energy generation if 2 moles of molecules involved. (b) A formula is given by ln P = ln a + b ln W where P = metabolic rate, W = body size, a = dependent of taxa, b = scaling exponent. If b is approximately 1 for plant, and b is approximately 0.75 for animal, find the relationship of P as a function of a and W in plant.
The power required for size reduction in crushing is???
Two methanol-water mixtures are contained in separate tanks. The first mixture contains 40.0 wt % methanol and the second contains 70.0 wt % methanol. If 200 kg of the first mixture is combined with 150 kg of the second, what are the mass and composition of the product? The symbol of weight percent is wt %.
diffirance between heat transfer & thermodynamics
3 Answers Shinsung Petrochemicals,
What is a common failure mechanism for above ground atmospheric storage tanks?
Corenuts technology interview questions
PLEASE ANY ONE READ THIS MESSAGE ANSWER ME AT MY EMAIL ID surendrasaroj18@gmail.com sir i am prepairing for section engineer exam taken by railway my branch is chemical engineering i want previous paper of chemical engineering of section engineer exam taken by railway. please answer me as soon as possible thankyou
NATURAL GAS ENGINEERING - QUESTION 26.1 : (a) In natural gas pipe sizing, the length of the pipe from the gas source metre to the farthest appliances is 60 feet. The maximum capacities for typical metallic pipes of 60 feet in length are : 66 cubic feet per hour for pipe size of 0.5 inches; 138 cubic feet per hour for pipe size of 0.75 inches; 260 cubic feet per hour for pipe size of 1 inch. By using the longest run method : (i) Find the best pipe size needed for the capacity of 75 cubic feet per hour. (ii) Estimate the suitable range of capacities for the pipe size of 1 inch. (b) The maximum capacities for typical metallic pipes of 50 feet in length are : 73 cubic feet per hour for pipe size of 0.5 inches; 151 cubic feet per hour for pipe size of 0.75 inches; 285 cubic feet per hour for pipe size of 1 inch. By using the branch method find the best pipe size needed for the capacity of 75 cubic feet per hour when the length of the pipe from the gas source metre to the appliance is 52 feet.
What is an effective means of removing silicon from aluminum?
What is maximum recommend pipe velocity for dry and wet gases?
What factors should be compared when evaluating cooling tower bids?
What is the difference between multi grade filter and dual media filter?
1 Answers Dalkia, Oil and Gas Jobs,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)