Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


why we measure output of transformer in kva?



why we measure output of transformer in kva?..

Answer / guest

The output of a transformer will be dependent on the power
factor of secondary,but this power factor varies depending
upon load ,hence the rating is not specified in
kilowatts,instead indicated by the product current and
voltage called VA RATING and is indicated in KVA

Is This Answer Correct ?    11 Yes 3 No

Post New Answer

More Electrical Engineering Interview Questions

Diffrectiate between earthing and neutral

6 Answers   TATA,


ganaretors A check B check and C check details

1 Answers  


What are the factors which influence the choice of specific magnetic and electric loadings of a synchronous machine?

0 Answers  


25 kvar capacitor , how much current ? For 25 KVAR--Capacitor I = ?

3 Answers  


what is feeder bay?

0 Answers  


if the supply frequency increases what happens to the motor load

2 Answers  


what are earthing material

1 Answers  


what is total power generation in tamilnadu What are the methods used powerfactor improved? which place DC transmission line usde?

5 Answers  


sir, i'm preparing for hpcl exam officer trainee pls tell me how the exam ques paper pls pls

0 Answers  


what is the problem when i want to close a circuit breaker by local position it closes well.but when i close it in remote position it trips

0 Answers   KPCL, MDIM,


Is it possible to interlock between ACB & MCCB?

2 Answers   Areva,


How generator NPS(NEGATIVE PHASE SEQUENCE TEST)TEST WAS DONE? PROCEDURE WITH DETAILS?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)