how clculate excavated or backfilling quantity by
simpson's rule
No Answer is Posted For this Question
Be the First to Post Answer
How do we get this formula Ast=(0.5Fck/Fy) into(1-(in sqrt(1-((4.6Mu)/Fck.bd^2))into bd Fck=grade of cement i.e M25, M20 Fy=grade of steel i.e.Fe415,Fe250 Mu=moment b=width d=depth
what is the effect of duration of earth quake on framed structures ?
structural engineering based
What is componsation
0 Answers Nagarjuna Construction,
How to find the thickness of RCC concrete ex.10'x10'. what"s the thickness, we provide and what"s the formula?
Wat are the elements consider in the shuttering load design calculation
Calculate no of brick req 230cmx115cmx100cm
why construction joint in the slab should be l/3 of span? what's the technical reason for that?
What is meant by Characteristic Strength of concrete/concretemix and how is it related to the 28 day cube strength. Are these defined in either or both B ritish Standards or Eurocodes?
WHICH BOOKS ARE AVAILABLE FOR CIVIL MPSC
how to conversation of all construction material in to brass
why the compressive strength of concrete is calculated only after 28 days.why not after 25, 26,27 days..
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)