structural engineering based
Answers were Sorted based on User's Feedback
Answer / nand kumar
the structural engineering is based on the bulding project, to easly design a buildings like as (auto-CADD & state pro soft ware are sed to design a structure)
| Is This Answer Correct ? | 5 Yes | 1 No |
Answer / structural engineer
the skill of safe designing of structures meeting proper material requirements eg- steel required, along with their desired size to makes a structure work.
| Is This Answer Correct ? | 1 Yes | 0 No |
Thumb rules for 1.brickwork & Blockwork 2.Plastering 3.FLooring and tiles 4.Shuttering 5.Steel
Rate analysis of painting
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
how is the wastage component in structural steel being considered while doing the reconcillation for the fabrication with returning of scrap under 1 meter length
4 Answers LIC, NTPC, Tata Steel Limited,
What is the standard volume of pharma in cub ft
0 Answers Deepa Constructions,
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
0 Answers AIZAZ General Contracting General Maintenance, GK Realtors,
In case of concrete cube test were all three molds are attached together do you cast your cubes simultaneously at the three molds every 50 mm or one after the other?
what is compressive strength of concrete?
What is the Laplenth for Reinforcement for Verticl and horizontal Structures as per IS code?
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
10 Answers ACC, Awasthi Construction, Bitulink, Mir Akhter Hossain, SOT,
what is the functional requirement of cement plaster in RCC members & masonry?? Is it Manditory to do plastering on all RCC members(beams, Columns, Slabs)? in what places plasterring could be kept as an optional one???
For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)