What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?

Answers were Sorted based on User's Feedback



What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis..

Answer / surajitg

Labour cost is around Rs. 550.00 per cum of concrete and shuttering (clients shuttering) labour cost is Rs. 220.00 per Sqm.

Is This Answer Correct ?    31 Yes 21 No

What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis..

Answer / yaseen shah

in pakistan current rate is 32 per square feet of centering and shuttering but without materials!

Is This Answer Correct ?    3 Yes 11 No

What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis..

Answer / javeed

Rs. 200.00 per Sqm (clients shuttering and)250.00 (with out client shuttering)

Is This Answer Correct ?    7 Yes 16 No

Post New Answer

More Civil Engineering Interview Questions

In reclamation works what are the importance of geotextiles and sand?

0 Answers  


how to calculate round stirrups.

4 Answers   Infinity Engineering,


How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?

0 Answers   L&T,


flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force

0 Answers  


Explain what is Critical Path Method (C.P.M)?

0 Answers  






WHAT IS THE IMPORTANCE OF FLY ASH BRICK?

2 Answers  


Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.

0 Answers  


Name four load bearing elements (structural elements) in a framed building

1 Answers  


WHEN A RIVER STARTS MENDERING WHAT CONDITION WILL OCCUR?

3 Answers  


where does the hinged action while designing the strture

2 Answers   DLF,


What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.

0 Answers  


How many lap joints are sufficient in column reinforcement ?

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)