What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?
Answers were Sorted based on User's Feedback
Answer / yaseen shah
in pakistan current rate is 32 per square feet of centering and shuttering but without materials!
Is This Answer Correct ? | 3 Yes | 11 No |
Answer / javeed
Rs. 200.00 per Sqm (clients shuttering and)250.00 (with out client shuttering)
Is This Answer Correct ? | 7 Yes | 16 No |
In reclamation works what are the importance of geotextiles and sand?
how to calculate round stirrups.
4 Answers Infinity Engineering,
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
Explain what is Critical Path Method (C.P.M)?
WHAT IS THE IMPORTANCE OF FLY ASH BRICK?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
Name four load bearing elements (structural elements) in a framed building
WHEN A RIVER STARTS MENDERING WHAT CONDITION WILL OCCUR?
where does the hinged action while designing the strture
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
How many lap joints are sufficient in column reinforcement ?