Answer Posted / nag
Bill Of Quantity which is prepared at the moment of
erection and planned at supply of materials
Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
IS code for Rolling Margin of steel
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
undistributed samples are obtained by
Define absolute co-ordinates?
though u r a civil engineer, y r u interested in tcs???
significance of specific surface area of particles?
what is the tensile strength of 10swg and 8swg gabion wire?
why do we provide haunches in rcc box or underpasses?
What is portland cement
What is Critical path in Ms-Project ?
construction workers how much time take one work or qty
what is the water cement ratio for plastering
States some of the tool bars used in cad?