Answer Posted / nag
Bill Of Quantity which is prepared at the moment of
erection and planned at supply of materials
| Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
Why are pull-out tests performed for soil nails?
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
What goals do you have in your career?
How did the romans get water up hills using aqua ducts?
"Gates of the dams are generally designed of curved shape". Why?
What is the difference between shear and tensile strength?
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
What is the zero value in quantity surveying
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
Explain major difference between auto level and dumpy level?
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
density of crush sand & crush stone or grit powder
What is meaning of tlc