how much quantity of water is required for main wall brick work, partition wall brick work,and for internal and external plastering and how it is calculated?
Answer / vinay
if they give the give w/c ratio then we can calculate water quantity.
for eg if 0.3 is the w/c ratio then,
w/c=0.3
then 1 bag of cement contains 1.25cft so, 0.3*1.25= 0.375cft
1cft contains 28.34 litrs of water then 0.375*28.34=10.625 litres of water is required for 1 bag of cement, generally here for dry volume of concrete is taken as 1 and half times the wet volume i.e 1.54
Is This Answer Correct ? | 1 Yes | 0 No |
how to calculate rate analysis for column shuttering
What is the difference between nominal mix and design mix?
why +1 to be followed for calculating the no of bars in BBS. Please explain
how can we calculate cutting length of a column ring (300 x 600)
16 Answers AVL, Manchanda, Vardhman,
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
what is the productivity in aluminium shuttering per day
what is the meaning of 40/20 src
how many labour is required for 1cum of concrete?
purpose of hook and bend in reinforcement ?
How much overlaping required for welding the reinforcement bars in Columns & beams
What is the difference between opc cement to ferro cement
How many square meter can a worker/labor demolish a structure per day?