Answer / mustafa mohd layeak
Hign yeild strength deformed bar ( fy=415N/mm2 &
fy=500N/mm2 )
Is This Answer Correct ? | 98 Yes | 11 No |
Answer / ashish sati
HYSD means high yield deformed bars have much high yield
point but the yeild point is not defined.
The yeild stress is given by 0.2% of proof stress.
HYSD bars of different grades and types are:-
Fe415 grade, Fe500 grade,Fe550 grade and TMT steel.
Is This Answer Correct ? | 45 Yes | 13 No |
Answer / anil raut
High Yield Strength Deformed Bar ( fy=415N/mm2,
fy=500N/mm2 & fy=600N/mm2)
Is This Answer Correct ? | 39 Yes | 9 No |
Answer / sreenivas sake
High Yield Strength Deformed Bar ( fy=415N/mm2,
fy=500N/mm2)
Is This Answer Correct ? | 8 Yes | 0 No |
Answer / indrajeet kumar
Hysd bar has more straight and ductility due to increase in carbon contain
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / vasu kalyan
High Yeild Strength deformed bars (fe-415)
(Fy=415,fy=500)
Is This Answer Correct ? | 0 Yes | 0 No |
what is dead wall?
What are the different softwares used for cad?
plz tell me max persantage of sand for every mix design by volume or weight.
if column length is 12'(feet) then how to take ring bar on it?
Please tell me how to calculate the stiruup length for rectangular and circular coloumns
How to test the quality of Ready Mix M20 concrete (1:1.5:3) before casting at site when lorry arrives? Are there any methods?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
0 Answers APGenco, Emaar, Madhucon,
what is the problem not getting 7 days slab cycle in Mivan formwork? what is the output of mivan carpenter per day?
Terms Name the bars which is used in beam and colume ? Like starter bar etc.
what is the weight of 12 mm 40 mm aggregate?
which grade of steel is better for construction of building under earthquake zones ? why?
Mix proportions of m30,m35,m40