sir, how to calculate steel per 1 m2
what"s the cement, sand, aggregate(consumption) quantity for 10 cm thick roof slab (1:2:4)
For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?
in 1:4,1:6 and 1:8 cement mortar mix how much water required? and find water cement ratio?
how much water you will add to the mix, for making 1 m3 of concrete to achieve strength of mix 20N/mm2 at 28 days.
I've one slab of 24m x 43m. How to calculate required steel For this slab.
what is civil all interview questions
How to calculate brick work quantity?? Block work quantity??
What is the difference between dumpy level and auto level.
How should i calculate Cutting length of haunch bar in a raft including cover?
which percentage is maximum in good quality cement?
Okay guys I m new here i wanna ask you that ,if i mix two three larger stones (about 20cm dia)in concrete for column or footings what actually happens, how the strength of concrete is reduced? and why it is not allowed?
what is the quantity of cement sand and metal in a 1m^3 m15 standard concrete