how many men days of loburs and masons are requirete for 1
cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8)
thanking you
No Answer is Posted For this Question
Be the First to Post Answer
what is the minimum spacing required for slab & beam reinforcement
What is the strength of concrete with ratio 1:4:8 as per British standard or ACI
Distinguation between Developing Length and Lapping Lengh
coarse sand has a fineness modulus in range of
What is the IS code of Rcc & PCC
what is cement mortar cube size and strength in 3days, 7days and 28days
what will be the cement and sand needed for 1sqm plastering ? for ratio 1:6 and 10mm thick
What will you do if you encounter problems like accidents?
What are the uses of groynes?
how many litres of enamel paint required for 5000 sft of site??
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
1.what is the main responsibilites of Site Engineer ? and what are main attitude ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)