Why catalyst is charging in chemical reaction as high
pressurized pellet of tablet?
Answers were Sorted based on User's Feedback
Answer / muhammad ramzan
Catalyst is charged as high pressure pallets or tablets to
give high surface area to catalyst because rate of reaction
is directly proportional to surface area in any kind of
chemical or biological reaction
Is This Answer Correct ? | 2 Yes | 1 No |
Answer / nilesh
May be I know that catalyst normally charged in powder form bcz at powder form increase the surface area of catalyst to compare the pellet form.
Is This Answer Correct ? | 0 Yes | 0 No |
Explain the process of including heat exchangers in ammonia refrigeration system?
Question 63 – Autocad computer program is used to draw a pipe that is used to transport natural gases for processing. Actual length of the pipe is 10 metres. The pipe has cross sectional area of circle in shape with measured circumference of s = 3 metres. (a) If 10 units are used to represent the actual length of the pipe in computerised engineering drawing, find the diameter of the pipe, d that will be shown in the engineering drawing. (b) If one unit in the program equals to 1 centimetre, find the scale used in the computer program.
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.18 : An investor is planning to purchase a small office for biochemical engineering consultancy on loan. In the calculation of the discount of payment in arrears, the following formula is used : y = 1 / (1 + r) ^ 1 + 1 / (1 + r) ^ 2 + 1 / (1 + r) ^ 3 + ... + 1 / (1 + r) ^ n where y = present value, r = interest rate of discount, n = number of payment, ^ = power used in certain computer languages for mathematics. (a) What is the meaning of : arrears? (b) Find a mathematical equation of y (1 + r). (c) Calculate, in less than 3 terms, y as a function of r and n.
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.24 : (a) The net present value of an engineering project is given by V. Let Q = summation of [ T / (1 + I) ^ N ] from N = A to N = B, where P = project cost, T = tax inflow, N = duration. If V = P + Q where P = -$1000, T = $275, I = 0.12 (means 12 % , capital cost of project per year), A = 1 year, B = 5 years, calculate the value of V. (b) The present value tax shields are W = $ (11.9725, 9.1486, 6.5579, 4.1811, 2.0005) in 5 beginning balances of an engineering project. Find the adjusted present value of the engineering project X, when X = V + (summation of the values of W).
What are the specialized crushing methods?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.20 : Assume an engineer buys a $1 bond in period T while the nominal interest rate is R. The inflation rate at T + 1 is anticipated to be I. (a) If the bond is redeemed in period T + 1, how much money will the buyer engineer receive, in term of R, which is not affected by inflation? (b) Find the present value, PV of the proceeds from the bond, in term of R and I. (c) If the bond is redeemed in period T + 1, calculate the real growth or real value of the money that the buyer engineer will receive, in term of r = real interest rate, which is affected by inflation. (d) From the answers in (b) and (c), find the values of x, y and z in the following Fisher equation : (1 + x) = (1 + y) / (1 + z), in term of r, R and I.
Re: Sugar Cane Bagasse What are the 1. Specific Heat of Bagasse at 50% moisture, 40% moisture and 25% moisture? 2. What is bu;lk density of bagasse at 50% moisture, 40% moisture and 25% moisture? 3. What is specific gravity of bagasse at 50% moisture, 40% moisture and 25% moisture? 4. What is the specific heat of flue gases generated from boiler fuelled by bagasse? 5. What is the specific gravity of flue gases generated from boiler fuelled by bagasse?
When using a pumping loop to mix two miscible fluids in a tank, when can the content are considered well mixed?
send me previous year question paper for ongc gt 2011 written exam
Question 58 – In the design of a solar power system steps of calculations below are followed : (a) The power output of the inverter of the of the solar panel is 100 watts. What is the power input, Pin to the inverter when the efficiency of the inverter is 50 %? (b) If the rated power of the inverter is 300 watts, how many inverter is needed for the solar panel? (c) Charge controller of V = 12 volts is used to supply power to the inverter. What is the input current I to the inverter? (d) If the charge controller capacity is 10 A, how many charge controllers are needed? (e) If a biochemical mixer consumes 100 watts, running for 2 hours per day, what is the energy consumption in kilowatt hour per day? (f) What is the input energy needed when the efficiency of the inverter is 50 %? (g) If your area receives 2.88 hours of full sunlight per day, how much energy, in kilowatt hour can be produced per day when one solar panel can produce 20 watts of power? (h) If you know that you have to produce total energy as the answer for (f), how many solar panels are needed? (i) Each V = 12 V battery has 5 ampere hours. If the total energy needed is in answer (f), then how many batteries are needed to run the biochemical mixer if without sunlight for 3 days?
i want to knowwhat kind of questions in interview in adnoc?
NATURAL GAS ENGINEERING - QUESTION 26.1 : (a) In natural gas pipe sizing, the length of the pipe from the gas source metre to the farthest appliances is 60 feet. The maximum capacities for typical metallic pipes of 60 feet in length are : 66 cubic feet per hour for pipe size of 0.5 inches; 138 cubic feet per hour for pipe size of 0.75 inches; 260 cubic feet per hour for pipe size of 1 inch. By using the longest run method : (i) Find the best pipe size needed for the capacity of 75 cubic feet per hour. (ii) Estimate the suitable range of capacities for the pipe size of 1 inch. (b) The maximum capacities for typical metallic pipes of 50 feet in length are : 73 cubic feet per hour for pipe size of 0.5 inches; 151 cubic feet per hour for pipe size of 0.75 inches; 285 cubic feet per hour for pipe size of 1 inch. By using the branch method find the best pipe size needed for the capacity of 75 cubic feet per hour when the length of the pipe from the gas source metre to the appliance is 52 feet.