what is the min and max ohmic resistance for the earthing
rod installed for lighting poles for street light network
what are the steps involved in generator load test?
Is there any decided or standard frequency to check the meager testing of transformer, DG set, LT Panel in the industries in a year. I means how many times we should be check the same.
Why Earth pits are inter connected
there are cam operated switches - why we call cam operated , What is cam ?
What is sensitivity of a measurement?
What meant by XLPE cable
Why in metering Ct for ammeters ct secondary side is grounded for each Ct but not in case of CBCT (Core balance current transformer)..kindly some1 highlights the reason..is it because net flux is zero?
What will be done if we open the secondary of CT on load??
What is plc.
How much resistance between neutral earthing and body earthing of Power transformer?
What are the various reasons for an inductin motor to get heated?
why open circuit test is conducted on hv side and short circuit test is conducted on lv side of a transformer ?what is the reason for it ?