Answer / amreeta
no it is to calculated like
100mm depth per 1m span ..when the total depth(D) is not
given.
after you get the total depth(D)
then calculate effective depth(d)
d = D-(cover of the beam +radii of the rod)
assume cover = 20-25mm
dia of the rod 16-20mm
Is This Answer Correct ? | 1 Yes | 0 No |
qube strenth in 7nth days test
Why do we use stirrups in columns?
16 Answers Rishi Infra Projects,
How much binding wire required in 1 MT Reinforcement? How much Nails Required in 1 Sqmtr Area work progressed
( mean sea level )for which activity we will use this statement?
What is the bending moment ?
1 Answers L&T, Manav Infra Projects,
What is meant by Friction Pile?
1:6 brick masonry cement and sand calculations
Method for Calculating the WEIGHT OF ANGLE ?
How much cum. Brick work can do by 1 madon
In Rcc work what ratio we need?
How to convert sqft in cft
What is rate of concrete surface rendering work per sqm