Hi Dudes, I have completed B.E Civil with two years
experience in Highway& Bridges. One year experience in Site
field & One year experience in Planning & Billing Dept. I am
willing to work in abroad, i am having passport and all..So
if anybody knows about foreign vacancy pls inform
me..Ph:9994050979 & Mail Id: Simacivil1988@gmail.com
Answers were Sorted based on User's Feedback
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
what are the major benefit in auto level?
how much water you will add to the mix, for making 1 m3 of concrete to achieve strength of mix 20N/mm2 at 28 days.
I want to construct 1850 square ft of rcc apartment , with stilth parking , the site requires 18 ft of pile foundation , the apartment will be above ground parking , can some one guide me about the cost of construction of such structure in Pune ?
In T beam design, which are the regions selected as rectangular and Flanged ?
Current ctc and expected ctc? Should i tell or as per Compnany norms? I am not fresher (1 yr exp) so how should i Face it
how we can say that concrete is a plastic concrete
What is Heavy Concrete & Normal Concrete
Why we check specific gravity of admixture when we receive it? What is it's significance.
1)How to calculate concrete cube testing load by area in mpa 2) in kg/cme also
How to correct a column which don't have sufficient cover?
what is porosity??