how many no of light weight solid blocks of size 600x200x200mm
required for 1cum of block work
Answers were Sorted based on User's Feedback
Answer / amit
first of all mortar quantity has to be calculated.
it comes b/w 15% to 17.5% of total block work.that means 0.15 cubicmeter to 0.175cum.therefore
Actual quantity of Blocks required=1-0.15=0.85cum
hence Nos of blocks=0.85/(0.6x0.2x0.2)=36 blocks
2 to 3% wastege= 1 blocks
thus total quantity=36+1=37 blocks
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / v nagarur
1cubic meter/volume of cube gives us number of bricks,so, for,
600*200*200
1/0.6*0.2*0.2=41.66=42bricks
Is This Answer Correct ? | 1 Yes | 2 No |
Answer / amit
after considering mortar quantity & wastage=40 blocks
Is This Answer Correct ? | 0 Yes | 1 No |
How to calculate the amount of cement & sand required for plastering work with ratio 1:4 please give me an answer with detailed step.
6 Answers DSR Management, Simplex,
What would be the quantity of cement:Sand:Aggregate (1:2:4) requirement for slab casting measuring 1mtr x 1mtr x 0.10 mtr (4 inches)?
what is a moment connection and shear connection ? where it provided ? why it provided ?
Camber of 15 mm is to be provided at free end of the cantilever what dose it mean??
1.why can't we used sea sand in construction? 2.can we change sea sand into normal sand? if yes how?
what is periode of deshuttering of slab our span length 21m,and width 2.5m grade of concrete M-35
As column is compression member then why we use steel to make it reinforced as it is already capable of taking compressive load?
2 Answers MBL Infrastructures,
Name the standard sand for concrete tests
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
Can a 24" RCC beam can rest on 18" RCC beam.
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal