how many no of light weight solid blocks of size 600x200x200mm
required for 1cum of block work
Answer Posted / amit
after considering mortar quantity & wastage=40 blocks
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
In which code the the maximum height of concrete casting has been explained
How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097
Why should pumping be not used in case of concreting work?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
What is specific gravity???
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
In a concrete grade C35A, C & A stands for what and equalent cube strength?
Why do you want to work here
at which depth the construction of tunnel is economical from cost and engineering aspect.
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
what is pqc
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
quantity of material needed for rubble stone masonry for 1:4 and 1:6
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.