how to stop beam concrete between column
No Answer is Posted For this Question
Be the First to Post Answer
What are some structures that may be subjected to fatigue?
What is a hatch patterns?
What is the difference between engineering stress and true stress?
How Calculate Lap Length
what is the difference between site engineer & site incharge
how to estimate plastering quantity if the given object is in circular. 12 mm thick both side 1:3 example= i have 8.15 m2 how to estimate quantity
in built up area basis what is ratio of concrete & steel ratio may be consider in per sqft quantity
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
how many lab test on bricks and aggregate write briefly please
how calculate the bearing from two coordinates?
0 Answers DPTL, HPPCL Himachal Pradesh Power Corporation Limited,
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
-what is the meaning of M.S.L for civil field? -what is the grade slab and suspension slab?