Bitumen grades are 30-40,60-70, 80-100. what is mean by 30-
40

Answers were Sorted based on User's Feedback



Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40..

Answer / ujjawal u. d.

the penetration caused by standard Condition i.e.
Standard Weight= 100 gm
Standard temp. = 25 Degree C.
Standard penetration time = 5 Seconds
Unis = 10th of mm to show the results and avoiding Errors
e.g. if the value is 30/40, the 30/40 is the bitumen
penetration value (tested in standard condition) lies
between 3 to 4 mm.

Is This Answer Correct ?    109 Yes 7 No

Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40..

Answer / nilesh ghadge

IT MEANS IT HAVING THE PENETRATION VALUE BETWEEN 30 TO 40

Is This Answer Correct ?    141 Yes 47 No

Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40..

Answer / tawalbeh

yes, and the unit is (0.1mm) ..
e.g: 80 = 8mm = 0.8cm

Is This Answer Correct ?    98 Yes 13 No

Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40..

Answer / venky

the needle denotes in 1/10th 's ofmm....so it mean 3mm to 4 mm

Is This Answer Correct ?    50 Yes 7 No

Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40..

Answer / anwar_eng04

the rage 30-40 means the bitumen has having grades between
these two valus and and it is determined by average
peneteration value of the test which conducted by the
instrument called penetrometer.

Is This Answer Correct ?    37 Yes 5 No

Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40..

Answer / hossain

Penetration value (tested in standard condition) lies
between 3 to 4 mm.

Is This Answer Correct ?    11 Yes 4 No

Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40..

Answer / abir kumar ghosh

30-40 means bitumen having penetration of a needle between
30-40 mm with standar weight on it at 25 deg Centigrade.
Lower the penetration is higher the viscosity.
The test is done with the apratus called Vicats apparatus.

Is This Answer Correct ?    28 Yes 25 No

Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40..

Answer / abir kumar ghosh

30-40 means bitumen having penetration of needle (with
standard weight)between 30-40 mm in 5 seconds at 25 deg
cent.
The test done with a apratus called Vicats apparatus.

Is This Answer Correct ?    26 Yes 23 No

Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40..

Answer / aditya richie

30-40 means bitumen having penetration between 30-40 mm .
The test done is called bituminous penetration test ,
machine used is vicats apparatus.

Is This Answer Correct ?    26 Yes 29 No

Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40..

Answer / bhuwan

penetraion is 30 t0 40 mm by 25 deg tem

Is This Answer Correct ?    11 Yes 14 No

Post New Answer

More Civil Engineering Interview Questions

What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?

0 Answers  


What is the formula to calculate the volume of mortar required for a wall with 1245 blocks with a stndard size of 440x215x100?

2 Answers  


Hi all, need Staad Pro V8i tutorial

1 Answers   Modi Builders,


how to calulate coping material of boundry brick wall 

2 Answers   Das Infratech,


how many shuttering material required for 100 sqm

1 Answers   NRI, Raheja,






what will happen if we pass electric current through rebars of RCC Slab(is there any strength reduction of concrete during this)??????????

2 Answers   Precast, SPC Systems,


How will you reduce the concrete flow after mixing the concrete

0 Answers   Hi Vision,


why secondry beam rest on primary beam

1 Answers   Exotica Housing Infrastructure,


Define What is a kip?

0 Answers  


what is the cost of rcc roof casting of 400 sq. ft. in kolkata

0 Answers   L&T, VCCL,


What will be the maximum length of RCC Lintels?

3 Answers  


What is the difference between a wood shake and wood shingles?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)