How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
1536Post New CDPL Interview Questions
Can crashed hard disk be repaired?
What is with ur in db2?
Explain the advantages of using a ball mill over other conventional methods of crushing?
What are the five project management process groups, in order? A. Initiation, Executing, Planning, Controlling, and Closing B. Initiation, Controlling, Planning, Executing, and Closing C. Initiation, Planning, Controlling, Executing, and Closing D. Initiation, Planning, Executing, Controlling, and Closing
What is a database in layman terms?
what are the six different type of argument values in cobol that can be placed in various options of a cics command?
Define modulation.
What products have you designed which have entered high volume production?
Explain how can you access a module written in python from c?
How to run a process?
Explain about the various time series forecasting technqiues.
What is difference between server and servlet?
Why are the columns in my datagrid in some strange order?
The permanent reduction provided by the final drive in heavy vehicle is a) 4:1 b) 6:1 c) 8:1 d) 10:1
Explain the sorting algorithm that is most suitable to be used with single linked list?