what is the detention period for oxidation ponds
Answers were Sorted based on User's Feedback
Answer / m. ghailani
The detention time of oxidation pond is equal to influent
discharge divided by the volume of pond.
| Is This Answer Correct ? | 6 Yes | 3 No |
how do you measure the 1:2:4 and 1:1:2 proportion rcc concrete for one cubic metre? what is the cement qty. sand qty. jelly qty.
what is the name of software for designing of R.C.C.structures
How do i calculate material requirements for various concrete ratios, brick masonry for 1 cum?
1 cubicmeter liquid = how much litre
what is your role of in previous company as a construction manager
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
0 Answers Vishal Pipeline And Engineering,
In cement making,what is meaning of blend,fineness,density.
If a 12m main road straight is adjoined from both sides by 7.5 m road , how curves are given at corner for vehicle movement (measurement pls.)?
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
0 Answers Public Service Commission,
form work including the props can be removed from beams only after
waht are pressure bulbs
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)