Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
What do you mean by tolerance factor of concrete ?
what values & beliefs have guided you in your career path
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
what is the meaning of 40/20 src
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
how to clculate the %of concrete strenght achive after curing?load
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.