dg started in plc mode and load taken later one battery
terminal connection will be disconnected by loose connection
what will happen for dg and shall we connect battery
terminals while dg in load time?
No Answer is Posted For this Question
Be the First to Post Answer
IF THE OUTPUT OF A 100KVA, 415V GENERATOR IS STEPPED UP TO 11KV WITH A 500KVA TRANSFORMER,CAN THE TRANSFORMER BE LOADED ABOVE THE SOURCE GENERATOR RATING?
what happens when ac supply is given to D.C motor.
how will calculate the winding ohmic value in 3phase motors in h.p wise? ex.10 h.p motor winding value ph to ph ? 5 h.p motor any calculation please send me.
We have two Al.busbars each of size 125mm*10 mm connected in parallel.To increase the current rating ,can we connect third busbar of size 100mm*10mm in parallel to existing two busbars?In my opinion ,if we connect busbars of different sizes in parallel,then the busbar of lowest size will take much current.So this type of paralleling should be avoided .Am I correct?
why we use the 100% and 95% stator earth fault protection for the synchronus generator ?
0 Answers Operational Energy Group,
STATE WORKING OF SF6 C.B.?
What is trickle charging system?
On the transformer breather at what length should i change my sililca gel.
WHAT ARE THE FACTORS REQUIRED FOR SELECTION OF TRANSFORMER RATING?
13 Answers Tech Mahindra, Technip,
Power Factor Correction Panel (Manual & Automatic)
I have a 5KVA UPS. Total load to be connected almost 3KW. Ordering a battery pack with capacity of 1920VAh. How long will the backup time be?
How to calculate the rating of ELCB OR RCCB for an equipment?