Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How is rate analysis prepared for M 25 grade of concrete?

Answers were Sorted based on User's Feedback



How is rate analysis prepared for M 25 grade of concrete?..

Answer / pranav

Calculate the quantity of coarse aggregate + sand +cement +
method of placement + shuttering + method of curing

Is This Answer Correct ?    83 Yes 12 No

How is rate analysis prepared for M 25 grade of concrete?..

Answer / g pavan kumar

calculate the coarse aggreate+cement+quality
expensis+considered traveling charges+electric power
charge+technical persons charge+shurtring+curing cost and
additional mixing cost.

Is This Answer Correct ?    11 Yes 1 No

How is rate analysis prepared for M 25 grade of concrete?..

Answer / simarpreet upweja

Total Cost will be Material cost + Labour cost + Mode of pouring + mode of mixing and transit + Shuttering Cost + Curing cost in later stage

Material cost will include cost of water + Recron(any fiber if adding) + admixer + coarse aggegate + fine aggregate + sand + Cement + Flyash (if using crush sand).

There are many ways of mixing.
i) If using batching plant then cost of transit millers and plant.
ii) If mixing is done at site by mixer then there will be no cost of transit.
iii) If mixing is done manually then it will be covered under labour cost.

Labour Cost : Self Explanatory

Shuttering Cost : As per surface area multiplied by cost per unit area.

Curing Cost : Self explanatory. Curing can be done by many ways so first you will have to decide method.

Is This Answer Correct ?    3 Yes 0 No

How is rate analysis prepared for M 25 grade of concrete?..

Answer / fayyaz tabussam

calculate the concrete batching plant running cost,material
cost,shuttering cost,curing cost.

Is This Answer Correct ?    15 Yes 17 No

Post New Answer

More Civil Engineering Interview Questions

Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......

0 Answers   Contech,


How many number of bricks required for 1 cum & how much mortar quantity require for 1 cum

22 Answers   Assurance, Campus Interview, R Tech Developers, Ramdev Construction, Synergy,


Explain why concrete barriers have curved surface profiles?

0 Answers  


what is the difference between np2 and np3 concrete mix

0 Answers   Sri Matha Constructions,


is there zone 6 for earthquake in india? on what basis the naming of the zones are done in variuos countries?

2 Answers  


suppose that  156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.

0 Answers   Progressive,


how to calcalate for roof beams & slab reinforcement design specified?

1 Answers  


can anybody provide me the HPCL apptitude papers?am having the test on march 2008 so plz

0 Answers   Bhel, DMRC,


What are the advantages of Prestressed Concrete

4 Answers  


what is meant by structural design

0 Answers  


what is the density of steel

10 Answers   NGO, PWD, Sepco,


what is the meaning of degreasing of the euipment or line.

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)