How is rate analysis prepared for M 25 grade of concrete?

Answer Posted / g pavan kumar

calculate the coarse aggreate+cement+quality
expensis+considered traveling charges+electric power
charge+technical persons charge+shurtring+curing cost and
additional mixing cost.

Is This Answer Correct ?    11 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

where can i get the previous question papers for rrb section enginerr (civil)

1872


how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')

2183


What are the joints wants to made in masonry where door opening, arches like etc..

1287


why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.

1471


For what purpose bedding is used under storm water drains?

667






What are the uses of alloys in daily life and how are alloys made?

865


660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need

1105


Which architectural movement is also known as jazz moderna?

842


Will going from a 3-tap to 6-tap increase water pressure?

654


which has high compressive strength between hollow block and brick masonry?

1861


Define Workability ?

797


can i get hindi version of is codes based on civil engineering?

3886


what is labour consume factor in residential projects

1857


1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

1691


what is the sequence of the activities in the typical under ground water tank including civil & MEP works.

1962