What is mean by vector group? For what purposes we doing
vector group test in transformers?
Answers were Sorted based on User's Feedback
Answer / satya dev
In the 3 phase AC systems all the phases are having Phase
displacement called electrical Angle.In the case of
transformers the windings are connnected in special Faison
called Vector group. DY11, DYn11 are the vector gruops
which are generally used in India.Testing of vector group
is only to test the electrical of Connected Phases in the
Transformers.
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / muhammad asghar
Vector group contains two things:
1- Scheme of Connection
2- Phase shift between LV and HV windings
For Example, if Vector Group is Dyn11 then
Capital 'D' means HV winding is connected in Delta
Small 'y' means LV winding is connected is star
Small 'n' means LV winding has a neutral also
11 means LV winding is leading HV winding by 30 degree.
| Is This Answer Correct ? | 5 Yes | 1 No |
why various test are performed on electrical panels & power cables before commissioning on site & what are these test???
Give details on how you intend to handle a challenging position you are posted to manage unexpectedly as a company staff?
what are the breakdown voltage rating of mini- curcuit'transfarmer!
what is the effect of power factor in electrical circuit ? if we mainten power factor near about unity (0.999) our energy consumption Units increase or decrease?
11 Answers Piramal Healthcare,
explain working principle of earth leakage relay
0 Answers Divis Laboratories, SMIORE,
I want to wire sizing calculator which website is available it
Either the Armoured Earthing strip of HT 3 core cable have to pass through CB CT or not , why ???
I am having a 42KW 3 phase electrical heating furnace, heating element is 80/20 nichrome material, my connections is made in such a way that 2 star connection compromising 2 coils per phase so totally 12 coils, shall if i use it unbalanced star condition (instead of 2 group of 3 phase or 1 group of 3 phase, connecting 4 phases of 5 phases) what will be the consequences and is it acceptable?
while buying 30 kva on line ups for 1 phase ouput, we ave to calculate the number of batteries for 2 hours back up? how to calculate the ah rating and number of batteries
what are the 4 rules to start the motor?
what are the standard values for resistances(Megger testing) between L&N, L&E and N&E (L=Live,N=Neutral, E=Earth)?
How to connected to energy meter, pt, ct, ammeter, voltmeter and selector switch.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)