hi frnds...pls send me aptransco previous papers
.....pls..pls,,,(madhar.rocking@gmail.com)and suggest me
some websites
No Answer is Posted For this Question
Be the First to Post Answer
how to get electrical supervisour certificate in gujarat
what is the means of dedicate earthing?
Which pump set is more suitable and economical for liftingwater from 300Mtr borewell? A. Compressor Pump B. Submersible Pump C. Jet Pumps D. 25HP Centrifugal Pump Q. from PSC Test 22-11-2008 Meter reader
I hv a question regarding power factor improvement just after transformer. I request you to reply me plzz. thank you sir. My friend has a small unit of fabrication. in his factory the main load is a welding machine, lathe machine, grinding machine. this load is not continuous type. now our electricity board has installed 16 KVA, 11000/433 V transformer for our factory. In the energy meter (trivector meter) at LV side of transformer, i hv seen power factor value of 0.15 only when only 3 KW load was flowing. Further electricity board has suggested to install 4 KVAR capacitor at LV side after energy meter. Now my question is that if we permanantly install and switch on 4 KVAR capacitor after energy meter, during some load on transformer and also without any load on transformer, wht will be the power factor shown in energy meter?i dont want to get any penalty by electricity board, so plz suggest me if i can permanantly install and switch on the 4 kvar capacitor or not at LV side of transformer just after energy meter? Thank you again and awaiting for ur positive reply soon.
why neutral busbar size is half of the phase busbar size in control panels
In what circumstanced the CT used for protection relay will be saturated?and what will happen to the relay is the CT is saturated?
I am an electrical power engineer and arranged power system for a data center, I installed MCB, ELCB and erthing system TN-C-S. But some times several ELCBs Disconnect circuits at the same time! what may be the reason? (the ELCBs are 25A ,30mA)
If the primary side current of 33/11 transformer is 64 amps then what will be secondary side current?
What are the probable causes for failure of heating elements
Do you need any help with FEWA Electrical Supervisor exams?
I am in last year of Engineering.I want to apply for ONGC on GATE based score.They require Certificate of Competency as Electrical Supervisor.How can i get this certificate so I can apply for AEE(ELECTRICAL) in 2016
how to extend relay operating timing in 24V dc relay card (without using Timer )
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)