Which one is the main bar in a square slab (2m x 2m)

Answers were Sorted based on User's Feedback



Which one is the main bar in a square slab (2m x 2m)..

Answer / nilnirjon

both bar

Is This Answer Correct ?    22 Yes 3 No

Which one is the main bar in a square slab (2m x 2m)..

Answer / vijayakumar

Bottom bar

Is This Answer Correct ?    17 Yes 3 No

Which one is the main bar in a square slab (2m x 2m)..

Answer / pardeep dhiman

there are two types of slab one is one way and second is
two way if the size of slab is 2m*2m the ratio of
length/width is less than 2. so it is called two way slab
and two way slab are designed by assuming both direction
main. so both bar are main.

Is This Answer Correct ?    8 Yes 1 No

Which one is the main bar in a square slab (2m x 2m)..

Answer / adinarayana.g

Bars placed at bottom row is main bar and bars placed at top
row perpendicular to bottom bar is distributor bar

Is This Answer Correct ?    6 Yes 2 No

Which one is the main bar in a square slab (2m x 2m)..

Answer / narmadha

Both top and bottom bars

Is This Answer Correct ?    4 Yes 3 No

Which one is the main bar in a square slab (2m x 2m)..

Answer / peddaiah

7850kgs/mt steel

Is This Answer Correct ?    1 Yes 0 No

Which one is the main bar in a square slab (2m x 2m)..

Answer / ajay kumar

Weight of 1 cu.m steel ?

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

which Indian standerd code is used for billing

4 Answers   Desai Construction, DLF, NKG Infrastructure,


What will be weight of 0.5mm GI sheet per sq.ft?

1 Answers  


how much cement and sand is used for plastering 1646 sq feet,for 12mm thickness and ratio 1:4

3 Answers   L&T,


best option for job in construction govt or pvt for engg

3 Answers   Omaxe,


is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?

0 Answers  






10x10 slab design

1 Answers  


what is the ideal temparature for concrete?

5 Answers   HCL,


How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)

0 Answers  


what is mean by eccentric footing?

3 Answers   Shiva Corporation,


time and work questions

0 Answers  


name three materials used in drainage work

7 Answers  


give me an example of a time when you had to explain some new procedures to your co-workers for quality service delivery, how did you go about it?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)