Which one is the main bar in a square slab (2m x 2m)

Answer Posted / peddaiah

7850kgs/mt steel

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is your role of in previous company as a construction manager

1569


do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?

1209


20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u

1895


if dia of slab beam bar is38mm what its clear cover any method of provide clear cover

1642


How do you prepare Material Recovery Statement for deduction from contractors bills?

1107






For a washout valve why are two gate valves required in normal practice?

672


What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?

1170


how much cement sand n bricks required in im3?and how much in plaster?

2106


how to caliculate required amount of cement and sand required for 1cu.m.

1737


Design a rectangular channel.

2459


How can we convert weight batch to volume batch for m30 mix

2435


Define What are the uses of Groynes?

729


how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

2044


There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?

978


how to calculate the size of triangular ring in rcc column?

1354