what is lap length? why it is required?
Answers were Sorted based on User's Feedback
Answer / priya
In the construction of RC buildings, due to the
limitations in available length of bars and due to
constraints in construction, there are numerous
occasions when column bars have to be joined. A
simple way of achieving this is by overlapping the two
bars over at least a minimum specified length, called
lap length. The lap length depends on types of
reinforcement and concrete. For ordinary situations, it
is about 50 times bar diameter. Further, IS:13920-1993
prescribes that the lap length be provided ONLY in the
middle half of column and not near its top or bottom
Is This Answer Correct ? | 28 Yes | 2 No |
Answer / sjtbehera
Lap length are recquired when distance of structure is
larger than the length of Bars.
It is recquire to bind the two bars so that load can
carried.
Is This Answer Correct ? | 6 Yes | 4 No |
Lap Length is 3/2 lap Lenths. Depends on Road
Length.Methods are 3/2. ItS Reqiured is very impotant
Reniforcement continous.
Is This Answer Correct ? | 2 Yes | 9 No |
What is the least count of Theodalite survey?
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
Project at andheri west mumbai total area of 116000 sq ft near by..Please help me out for quotation plan is ready basic details are with me , please help me out .I will mail u in autocad also.
explain what do you mean by the property development.
Describe the various methods of concrete curing?
Differentiate orthographic and isometric projections?
Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,
How to convert rainforcement calculation: Running meter to kg
23 Answers Interscape, Pratibha Industries,
sir how can we find the cement and sand required for making 4" drop
For what purpose bedding is used under storm water drains, explain?
from where ican get sample papers for CET-delhi 2012
How to find weight of 1cu.m concrete in varies grades? and giive calculation.