how can we calculate the cutting length of 10,12,16,20 and
so on iron bars for 45 digree and 90 digree bents plz tell
me if there is any formula or tabel to find it

Answers were Sorted based on User's Feedback



how can we calculate the cutting length of 10,12,16,20 and so on iron bars for 45 digree and 90 di..

Answer / dopendra parihar

for 45 Degree 1D and 90 Degree 2D deduct Elongation for any bend

Is This Answer Correct ?    0 Yes 0 No

how can we calculate the cutting length of 10,12,16,20 and so on iron bars for 45 digree and 90 di..

Answer / harshit

For rectangular shear ring the cutting length formula is

2*(a+b)+2*10d-12d

Where a nd b are two dimesions and d is dia of bar

For 45' it took single d to minus
For 90' it took double d to minus.

Is This Answer Correct ?    0 Yes 0 No

how can we calculate the cutting length of 10,12,16,20 and so on iron bars for 45 digree and 90 di..

Answer / mehul dedhiya

There is no particular reference in any code for steel up to dia-20 mm its 2d deduction for 90 degree bend, and 3d deduction for 25 mm dia and more than it.

Is This Answer Correct ?    0 Yes 0 No

how can we calculate the cutting length of 10,12,16,20 and so on iron bars for 45 digree and 90 di..

Answer / n3

for 450 bend cl=0.42d
for 900 bend cl=9d

Is This Answer Correct ?    2 Yes 6 No

Post New Answer

More Civil Engineering Interview Questions

What is the strength of cement?

0 Answers  


which purpose we are provide groove at sides of door & window frames, columns & beams

1 Answers  


What is steel requirement for one cum concrete

3 Answers   ECCI,


how many cubic centimeter in one unit of sand?

4 Answers  


what is mean by bleeding of concrete

4 Answers   Afcons, Habib Group,






How will you determine the capacity of a reservoir with help of contur

3 Answers   Triveni,


Dfine superelevation.it depends upon which of the following. 1.surface condition of road 2.width of road 3.radius of curve 4.speed of vehicle

5 Answers  


state the difference between direct and indirect cold water supply scheme

1 Answers  


What are the tests conducted on coarse aggregates ?

3 Answers   Rites,


How many solid blocks can build one mason per 8 hours?

1 Answers  


what is the design procedure for building

0 Answers  


What is the purpose of Chipping in the heavy foundation?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)