Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) Three way plug point is there ,in that plug why we need earth pin is bigger than compare with phase and nutral pins?
IIT,
7 10641is there anybody who knows how to create a palindrome program without using string functions just conditional statements? thnx for helping
2233why on axial hitting up of air blast on hydrogen produced in oil circuit breaker,temperature rises of the core of the arc?
1977which engine have the high mechanical efficiency eighter 2 stroke engine or 4 stroke engine?
10 14308Explain about Dubai electrical sysaem? Explain about Dubai drinking water system? Explain about Dubai Burj tallest building Electrical,Water.etc.. maintenance system?
2177What is a purpose of slow firing before commissioning of bagasse based boiler. and what is the water requirement for make up?
1 14601what are the industrail measures to over ferranti effect? how would the ferranti effect the power system if those remedial mearsure arent taken? how often does this effect occurs in real power system?
2154
write a c programme for add of two numbers with out use of arthematic operators
What is megering????
Explain blood brain barrier?
Why Utility Distribution System in India is mainly at 11 kV? Why not Utility go for 33 kV?
What causes turbocharger surging?
Define armscye?
how to calculate transformer turn primary & secondary side 11kv to 420v
where is the need for short circuit test for 3 see is required and why? can you explain in brief with application
Do you know what is linen fiber?
Dear All, I am new in construction company , my boss ask a question at time of interview , If we have 60MW generation and Single Power Transformer step-up we have. if CMR 50/60MVA , ONAN, ONAF respectively , is it sufficient or not ? for that much power to transfer,
The output of a 60hz full-wave bridge rectifier has a 60 hz ripple. It this circuit working properly?
Why there is Powerfactor difference when we compare to our Capacitive Panel and TNEB side?
What is meant by pwm control in dc chopper?
Explain bearing
What are the different characteristics that can affect the flow of bulk solids and how?