Engineering AllOther (1379) hi vishok this is noor plz tell me what type problems will occured i use T/C in the place of RTD in (FEED WATER TANK),plz send ur e-mail address to my ID (mail2noor.hyd@gmail.com)
6 7996Difine the process you would establish to monitor the effectiveness of an emergency evacuation system
2481outline of the verious benefits of establishing a planned preventive maintenance system for major plant and equpment
ABB,
2083In india the power supply is always in multiple of 11, eg.220 V, 440 V... what is the reason?
BSES, Electrical, L&T, PSIT,
11 25560What is the angle of inclination for the oil connection from transformer conservator to Bucholz relay and why?
2225
what about SAP/MRP regarding manufacturing of electric motors and all drives?
whether fibre optic cable in high voltage earth conductor is used for protection circuits
differentiate between total moisture and inherent moisture of coal.
what is the current pay package for an instrumentation engineer having 2 years of experience in cryogenic technology???????
What is meant by value directed retailing?
Define Octane number and Cetane number
What are the reasons of removal of particles from effluent gas?
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
How to decide whether A / B / C / D curve type MCB should be used?
What are the advantages of load commutated chopper?
mix design procedure for 1:6 cement mortar
How will you test a transistor with a multimeter?
What are the methods of measurement? Describe it shortly
On Which Pressure PRV is operated.
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??