Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...



Engineering Interview Questions
Questions Answers Views Company eMail

what is FET

1 3827

What meant by XLPE cable

3 6155

So as to save petrol, can we replace some amount of petrol with LPG while injecting both LPG and petrol into a Petrol engine simultaneously (i.e., at the same time)???

2 5693

if compressive strength on 28day pass, and client is asking core test. is there any thing in standards allows that??

1 4680

how we design a pannel to start 10HP motor with the help of star delta starter?

2224

given data are load current & power factor cable core size? plz any one update the calculation formula

1902

i installed 100kva ups. what KVA genset they should provid in input side? plz any update formula or ans with reason.

2348

What is Process portal A(PPA)?

ABB,

1 5816

How Many Slave Can be used in one slave ?

2 5402

what is meant by negative half cycle

2 4128

Hi,My name is ranms i want to know the machine vibration related problems.post me if any body knows. 1) Possible causes of machine horizontal vibration high? 2) Possible causes of machine vertical vibration high? 3) Possible causes of machine axial vibration high?

1 2975

As per the Anchor capstan motor specification, full load current is 200A. starting current is 1750 A and acceleration time is less than 8 seconds. Please guide for selection of cable size.

1852

what do you mean by cathodic protection?

Saipem,

1 5810

What is a charge.?

4 5922

1 cu.m contain how many hollow & solid bricks?

L&T, SSC,

3 17159


Un-Answered Questions { Engineering }

What does the term “voltage regulation” means?

1111


What is the Temperature to be set in Thermostat provided in Marshalling box of the Transformer / Motor.

3028


Name some common problems associated with dilute phase pneumatic conveying?

1025


What is transformation ratio what it describes?

1707


what is the importance of signals and systems ?

17877


What happens to the series current , load current and zener current when the dc input voltage of a zener regulator increases?

1171


How to calulate Locked rotor amper(LRA) for compressor type motors?

1784


What is the purpose of LO Overhead tank in turbines.

2009


Why is it that a single, all – encompassing metric cannot be developed for programme complexity or programme quality?

2025


sir i applied for hpcl(electrical).i want to know from which subjects most of the technical que will b asked.and pattern of the written test.pls help me

1948


Technical paper's of ECE

2283


what is the meaning of MIN MAX?

1926


can a deareator be placed at any height with care that suction (NPSH) for feed pump is satisfied

1997


explain the omportance of "squish" and "swirl" in ci engine

3295


I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2