HOW TO FIND OUT 1. LINE CURRENT, 2. PHASE CURRENT IN AN
ALTERNATOR / TRANSFORMER WHICH IS FEEDING A I)STAR LOAD ii)
DELTA LOAD, USING A CLAMP METER.
NORMALLY WHEN WE USE CLAMP METER IN A DG SET THEN WHAT DO
WE GET?? PHASE CURRENT OR LINE CURRENT.
Answer
Is This Answer Correct ? | 25 Yes | 15 No |
Question { Power Grid, 32420 }
What is GIS Substation and how it operate? where these type
of substation installed?
Answer
Is This Answer Correct ? | 176 Yes | 9 No |
Question { 19310 }
what happens when d cexcitation given to alternator is
removed while it is running or what happens when dc
excitation is failed in alternator while running?
Answer
Is This Answer Correct ? | 18 Yes | 25 No |
1 tr is equal to how many Kw .is there any specific formula
for this to get the result .
Answer
Is This Answer Correct ? | 355 Yes | 44 No |
If load is 240 kw & pf is 0.8 lagging, than how to increase
it from0.8 to 1.0(unit),which rating capacitor used, please
give me Calculation. What is effact of consumer & suplier
if pf is lagging or leading with on effect machines/ TF/GE
etc.
Answer
Is This Answer Correct ? | 1 Yes | 0 No |
Question { 10556 }
what is the disadvantage if earth is connected to neutral
Answer
Is This Answer Correct ? | 22 Yes | 6 No |
What is AVR? Explain the function AVR?
Answer
Is This Answer Correct ? | 197 Yes | 18 No |
Question { 15067 }
if AVR fails in D.G set, what will be the effect?
Answer
Is This Answer Correct ? | 15 Yes | 5 No |
Question { 7388 }
What is power focter ?
Answer
Is This Answer Correct ? | 3 Yes | 1 No |
Question { 18833 }
On load tap changer (OLTC) explode?
Transformer
Vector group: Ynd11
Rated Power: 353MVA
Rated Current: 693A
Voltage:294/20KV
OLTC
Type: T III Y1000 110/c 12193w
Max Operation Current: 295A
Step Voltage: 550V
Arrangement in Tx windings: Y Connection
Problem: Damage of Unit 1 Generator Transformer On Load Tap
Changer (OLTC)
Description of Incident:
9.00 a.m. :- Generator No Load test on excitation system
started
10.30 a.m :- Carried out AVR change over
test
11.30 a.m :- Preparation for Generator Manual Synchronizing
test
12.00 a.m :- Manual Synshronizing test started.
Observed incoming generator voltage higher than running voltage.
CECR operator operated Generator Transformer OLTC to bring down
the incoming generator voltage
12.03 a.m :-Generator Transformer abnormal alarm operated at
Gen.Control Desk (CECR)
CECR operater at Generator transformer bay informed that the
transformer
oil splashed out from OLTC.
CECR operater informed that he heard explosion inside OLTC.
Observed Oil level & Oil Flow alaram operated at Tranformer
local annunciator.
12.05 am :- CECR operator 'Open Gen Field Breaker”
12.10 a.m. :- Elec1 team inspected the OLTC and found the
OLTC rupture disk was broken
and oil spilled at OLTC area.
- Elec1 found the OLTC top cover bulging.
Do anyone know why and possibility cause happen in this OLTC.
Answer
Is This Answer Correct ? | 1 Yes | 3 No |
wat is syncronization . wat parameter will take for
syncronization.
Answer
Is This Answer Correct ? | 17 Yes | 1 No |
Question { 5435 }
We have 2 no. 4MW DG set. and GEB supply.
But, we running, only 1 DG set. when we done APFC/Power
factor setting : 0.90, then winding temp. Low. but when
setting done : 0.83, then Winding temp. increase.
WHY Why ? ? ?, plz give me answer.
Answer
Is This Answer Correct ? | 2 Yes | 1 No |
Question { 4877 }
Can we connect more than one NGR at a time of different
rating of generators. what is advantage or disadvantage.
Answer