Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


why only violet glow appears in corona effect?



why only violet glow appears in corona effect?..

Answer / mohan kumar

mot only violet glow it has.....when there is positive point
corona bluish white sheath or violet appears on conductor
surface but during negative point corona reddish spots will
occur on conductor surface

Is This Answer Correct ?    5 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

Why 9KV surge arrester having 7.65KV of MCOV?

0 Answers  


why 120 devided with pole and speed multiplication to determine frequency

1 Answers  


current cyring capacity of .75sqmm copper cable

2 Answers  


in our sub station why we step down firstly 33kv\11kv then 11kv to 430v. can we direct step down 33v to 430.v.

7 Answers  


what is meant by CT burden = 10 VA?

1 Answers  


which %age if losses increases when frequency is increased to 25%

4 Answers   Maihar Cement, Siemens,


What is the difference between Isolator annd Circuit Breaker.

21 Answers   ABB, Lanco, NTPC, Power Grid, RInfra,


What is meant by turbo alternators?

0 Answers  


I want to calculate how much capacitor we connect to maintain the unity power factor? Is there any formula? Pls give me the answer

0 Answers  


in trains i have seen the terminal which is connected at the top of the train is positive .where is negative ? track? i dont think so

9 Answers  


length of 4 core cable 95mm from substation LV VFD panel to Motor at field approximately 150 meter. Motor stop and power has been isolated from LV MCC ( Substation )to disconnect Motor for services. After Motor completed service propose to reinstall and reconnect Motor Cable, found earth cable sparkling during touching at metal / motor body. Inspect by clamp meter found earth cable have current flow AC 1-2amps and all earth cable at MCC LV also have current flow as same value. why it is happen?

2 Answers  


List of equipments required foe industrial repair lab.

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)