can transformer develop three phase poer from a single phase source?..

Answer / bhagya

WE CAN DEVELOP 3PH POWER WITH 86% EFFICIENCY BY THE USE OF 2
INDIVIDUAL 1PH T/F.BY THE CONCEPT OF OPEN DELTA

Is This Answer Correct ?    2 Yes 0 No

can transformer develop three phase poer from a single phase source?..

Answer / guest

by phase shifter

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

We have 5 Distribution sections with variable loads&We have 3 Gensets(500kva,380kva&250kva) our total load is between 400kva to 600kva. so how could we connect 3gensets.

0 Answers  


Mention how NPN and PNP transistor works?

0 Answers  


how gen. load increase or decrease ? what happen with gen on that time

2 Answers  


If two generator running parallel, at that condition both ngr Taken in line or taken any one ngr, but why any one or both Ngr in line? Ngr is use for which purpose?

3 Answers  


Capacitor panel CT is normally fixed on Y phase of the main panel.why???

3 Answers  






draw the restricted earth fault protection circuit install on power transformer and identify its parameters and draw C/C curve of it

0 Answers  


What is critical disruptive voltage?

0 Answers  


why threre are two parallel lines in transformer's symbol?

11 Answers   NTPC,


why we don't use air circuit breaker on H T line in place of vacuum circuit breaker ?

2 Answers   Jindal,


I need bhel electrical test pattern & paper

0 Answers  


pls tell about gas insulated substation?which gas is used for that substation?above which rating we are used this substation?how we take maintenance in that substation?it means substation fully shutdown or live condition?if live condition means how?pls clear this things

1 Answers   Essar,


Sir,In our company there are 3 caterpillar make(capacity:(1) 3.3KV,2.5MW(2)3.3KV,2.5MW & (3)3.3KV,1.9MW) & 1 deutz make (capacity:11KV,3.8MW)gas engines utilised,all are running in paralell. There are three transformer utilised,(1) 6.25MVA,3.3KV/22KV,Impedence voltage:6.7% used for two generator,both are 2.5MW(2)5.5MVA,3.3KV/22KV,Impedence voltage:7.2% used for one generator of 2.5MW & (3) 5.5MVA,11KV/22KV,Impedence voltage:7.8% used for one generator of 2.5MW.all generator breakers capacity of 1250Amps. Sir,I want the details of fault level calculation of generator,transformer individually & for whole system. If you require any information from me.feel free for contact me sir.pl.send the answer of my question as the earliest as possible.

0 Answers   Piramal Healthcare,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16631)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1094)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)