What is vendor developement?
what is the logistics transport control?
Answers were Sorted based on User's Feedback
Answer / bhavani shankar das
Vendor Developement is the resource wise developement of
existing vendor as per the requirement of the customer.
Suppose the vendor does not have proper resource for
executing the customers requirement, then the customer
insist the vendor about some newly developed technology.
That is Vendor developement.
But collecting information about suppliers for getting
good material at right time is called as vendor sourcing.
| Is This Answer Correct ? | 7 Yes | 0 No |
Answer / p k dash
VENDOR dev.means get the information of wide range of
suppliers for a particular item in order to get right item
in right price from right party.
| Is This Answer Correct ? | 4 Yes | 3 No |
Answer / prafulla ranjan
Collecting information about the vendors involved in
manufacturing/supplying a particular items so that best
buys can be effected to minimise the cost of products
without compromising quality.
| Is This Answer Correct ? | 0 Yes | 4 No |
What is APIPA in DHCP?
How To Operate smoke Detector
What’s the normal transformer current rating?
What should be the material composition of transformer oil filtration machine to avoid metal contamination in filtered oil?
how do you check pump impeller back clearance?
we are using centum vp as monitoring with Dell precision work station T3600 but some times PC(s) are restarted automatically . how we can solve this problem? thanks
We will import machihery. how we will take input
0 Answers Balsara Engineering Products Private Limited,
Sir, we are manufacturer of splitter machine. we joint two knifes with welding electrode, BEST ARC, and ADOR, Grade E6013. but the time of welding the welded area comes to wear, what meterial(Electrode)is suitableto our requirement.this knife is press with Hydraulic operation.
any body tell me why 4-20 ma use as a current any reason for this amount why not 3-25 ma?
CHMER EDM MACHINE PRINTED CIRCUIT BOARD
How improvements can be made for designing the parts?
Why more than one purchase organizations are assigned to one plant?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)