Which code specifies the specification ofthe construction
joints to be provided in the raft slab of a basement which
is 6 m deep.what should bethe detail of such a joint?
No Answer is Posted For this Question
Be the First to Post Answer
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
how many cement bags in 1m^3 cement concrete in all grade
how to find water-cement ratio perfectly proportions M20, M25, M30
Which is the latest version of solidsworks?
Write short note on construction programme for pile foundation.
What are the problems one might face while having a Cantilever balcony?
how can we design dia of rainwater pipes ? plez explain by using formula ?
what is the name of coarse sand which is used in making of concrete
what is the development length formula as per concrete grade
How to calculate the thickness of the rcc slab?ll u pls tell the formula?
Camber of 15 mm is to be provided at free end of the cantilever what dose it mean??
In which grade of steel the laping length required is more,Fe 415 or Fe 500 ? and why?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)