Which code specifies the specification ofthe construction
joints to be provided in the raft slab of a basement which
is 6 m deep.what should bethe detail of such a joint?
No Answer is Posted For this Question
Be the First to Post Answer
if rise and tread of stairs rae 16 & 25cm with landing slab of thickness 100mm . If there are 8steps, and carpenter ask for to mark the bottom of centering of landing on column, what will be the height above floor finished level?
If the first roof slab is not deshuttering in this time shall I start column raising work in second roof is it correct or not
2 Answers Al Fara, Unity Infraprojects,
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
what is the function of fineness modulus to determine the concrete mix?
what is the mixing ratio of the cement mortar for tiles fixing in floor tiles?
5 Answers NLC, Prakash Engineers,
Explain about Sulphate Resisting Cement ?
Define What is passive earth pressure ?
How to calculate the lap length rod of column, Beam,Slab please give me a details?
4 Answers Ali Baba Engineering and Construction Company, Asha Realty Developers,
what is the weight of concrete for 1 cum?
What is the standard unit of bricks???
cinder filling or Brick Aggregate filling in sunken portion.which one is better
1 Answers Chenab Valley Power Projects,
what is the cost of per cum of pile foundation?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)