i want to design tap changer for 15kv to 0.4kv steepdown transformer then how can i calculate tap number required





No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer



More Engineering Interview Questions

how we can calculate the load appeared on programable logic controller.and what is the method to calculate the scan time of PLC.

0 Answers   Siemens,


what is the work of commutator and brush in motor

0 Answers  


What's is the mechanism of for stroke engine

0 Answers   Medha Servo,


when power factor leading above 1 than defect moter and kwh.

0 Answers   Syncom,


about metallurgy

0 Answers   Bhushan Power Steel,






how convert sqft into cubic meter and cubic meter into sqft

0 Answers  


Why we make body earthing of transformer and what will be the size of the copper wire for this purpose related to KVA Capacity of the Transformer as per code.

0 Answers  


Difference between ac and dc

0 Answers   Eaton,


Methodology for calibration for ctm.... Explain in simple way pls

0 Answers  


Handpump harness water dont go back.Why?

1 Answers   Focus Energy,


In an existing power plant (phase I) with step up transformers (3nos) with Ynd1 vector group to the 400KV bus bar,an extension power plant (phase II) with transformers (4nos) with Ynd11 vector group >. what are the consequences of such configuration ,please note that % impedance are also differ i.e. 15% & 10.5% the reason was that auxiliary supply interface is at different voltage levels i.e 400v & 6.6KV in phase i and phase II respectively .please advise ! Thank you !

1 Answers  


Why patra you join

0 Answers   Patra Corporation,





Categories