While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
No Answer is Posted For this Question
Be the First to Post Answer
What is the Requirements of indoor & outdoor Substation Construction? What is the main Safty Requirements for SubStation Construction?
Dear Sir , I have my diploma in civil engineering in distance mode, so can i do my B.teck in regular stream . kindly suggest Regards Ramakrishna
Can any colleague send me the steel frame pictures of roofs, beams, columns, footings, roof bends, door bends etc. I shall be very gratefull.Suhail_akhter@hotmail.com
what is the formula for lapping length
Different sizes of Hollow blocks and its weight. Thanks.
what is the difference between onw way slab & two way slab?
Let suppose A building wall is 12 ft high and 30 ft long and labour cost is 100 rupee per feet so calculate the total cost of labour and also explain in detail...plz ans me immadiately i am hurry Thanx
What quantity of 1.0 m3 bricks required?
density of crush sand & crush stone or grit powder
what is the size of moduler bricks
The Geological formation under subanshiri dam is- (1) sedimentary rock (2)metamorphic rock (3) igneous rock (4)none of the above
Is there any course for billing available in Mumbai? If yes then please mail me the details..
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)