Need advice for steel in kg for RCC Slab qty 35.64m3 and Beam/ column qty 35.39m3
Answer / yash
for rcc slab( 35.64m3) = 2.8 tonne
for beam (35.39 m3) = 5.6 tonne
for column = 6.9 tonne
not exact quantity . it is in lump sump
| Is This Answer Correct ? | 0 Yes | 0 No |
What is the lap length for tension members if you have 16 dia steel bar and a concrete fc=30.9 and steel grade60 fy=414 mpa
What is the meaning of 'variation' in construction of residential buildings
Unit weight of sand
how to caluclate sienerge qty in construction in ap
how new RCC roof joined with existing RCc roof
a)If column dimensions are 250*400mm , what will be cutting length for 8mm stirrups and how to calculate it? b) If beam dimensions are 200*400mm , beam coveris 25mm , slab cover is 20mm , what will be the cutting length for stirrups? c)Column dimensions are 250*400mm , reinf. is 12nos. bar of 16mm dia , stirrups provided are two legged, what will be the length of each ring? Regards
27 Answers Alfaraa, Speco, Supertech, Welspun,
what is the material consumption of 1:2:4 by kilogram?
Ehat slump test of column & retaing wall.
When column of building is abutting the boundary line,then suitable footing advised is
How much wastage we considered for cement
Which IS code is saying the detail of deshuttering period?
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)