Need advice for steel in kg for RCC Slab qty 35.64m3 and Beam/ column qty 35.39m3
Answer Posted / yash
for rcc slab( 35.64m3) = 2.8 tonne
for beam (35.39 m3) = 5.6 tonne
for column = 6.9 tonne
not exact quantity . it is in lump sump
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is difference between GTS bench mark and temporary bench mark
How to marking the building
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
why the openings of sieves are square io size?
plz.show development and anchorage length in simple diagram.
Why we provide hair pin for shed
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
What applicable rate of wct in bihar
What Are The Different Type Of Slump Test Indications?
Give me an example of a time when something you tried to accomplish and failed.
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
Minimum and maximum size of the building components
how lap length is increased with increase of Grade of steel?