Need advice for steel in kg for RCC Slab qty 35.64m3 and Beam/ column qty 35.39m3
Answer Posted / yash
for rcc slab( 35.64m3) = 2.8 tonne
for beam (35.39 m3) = 5.6 tonne
for column = 6.9 tonne
not exact quantity . it is in lump sump
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
Which architectural movement is also known as jazz moderna?
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
Any strength is a stress but any stress is not strength
What is the use of offset command?
what is the list of building construction equipment & teir output?
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
What is zoning permit?
Explain the Strength of brick?
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
How to determine thee cut length for steel reinforcement bars in R.C.C design
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
How to calculate material and labor required for 100 m2 plaster?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
How do we calculate the power of centrifugal pump?